Azizi's Jebel Ali residential project set for Q2 completion


UAE-based Azizi Developments said 85 per cent of the work had been completed on its 479-unit development, Aura, located in Jebel Ali area of Dubai. The project, which boasts 349 studios, 87 one- and 43 two-bedroom apartments, will be ready by Q2.

Azizi Developments, a leading private developer in the UAE, has accelerated work on Aura in Jebel Ali and is now marking the 85 per cent construction milestone. 
 
Working with established contractors and consultants, Azizi is well on track to complete the 479-unit development, which comprises 349 studios, 87 one-bedroom, and 43 two-bedroom apartments, by Q2, 2020, highlighting its commitment to timely project delivery. 
 
Aura is one of the very few freehold residential developments in the heart of Jafza, the UAE’s flagship integrated business hub, largest matured free zone area in the world and biggest port in the Middle East region, said the statement from Azizi. 
 
With the UAE Exchange Metro Station and Sheikh Zayed Road right at its doorstep, and designed with ample lighting and spacious areas, Aura is for those seeking a modern, lively lifestyle, it added. 
 
Aura features a comprehensive range of amenities, including two swimming pools, a gym, a health club with sauna, vast open spaces and recreational areas besides concierge service, covered parking and a podium level with over 9,000 sq ft of retail space. 
 
Homes in the immaculately designed tower comprise premium appliances and bathroom fittings. 
 
The Dubai developer pointed out that the structure was now 100% complete, while the blockwork and internal plastering work were at 99% and 98% respectively. 
 
The second mechanical, electrical and plumbing (MEP) fix is now at 93%, with façade works and tiling both having reached 90%, it added. 
 
Azizi has also recorded the 86% completion of the heating, ventilation and air conditioning (HVAC), 85% for the elevator works, and 82% for the overall finishes. External works and the swimming pool are progressing rapidly. 
 
Executive Director (Engineering) Mohamed Ragheb said: "It fills us with immense pride to see this world-class 18-storey development materialise at such a fast-tracked pace. Aura is one of the many developments Azizi looks forward to handing over to our happy, valued customers this year, with two 2020 completions already under our belt and many more to come."
 
"As part of our unwavering pursuit of delivering on our promises, we maintain remarkably high levels of operational efficiency and excellence, all while taking precautionary measures — amid the current global situation — that meet and exceed circulated advisories”, he added.-TradeArabia News Service