Al Karaana Lagoon

Owner Public Works Authority (Ashghal)
Estimated Value US$ 50,000,000
Sector Water
Sub Sector Waste Water Treatment Plant
Country Qatar
City Rayyan
Capacity N/A Feasibility Start Date Q2-2015
Status Engineering & Procurement Project End Date Q3-2020
Owner Public Works Authority (Ashghal)
Estimated Value US$ 50,000,000
Sector Water
Sub Sector Waste Water Treatment Plant
City Rayyan
Country Qatar
Capacity N/A
Feasibility Start Date Q2-2015
Status Engineering & Procurement
Project End Date Q3-2020


Project Overview


Background

Public Works Authority (Ashghal) is on track to rehabilitate a wastewater treat plant called Al Karaana Lagoon in Rayyan. The main goal is to eradicate the lagoon and carry out a comprehensive overhaul of the site, in continuance of the measures taken to date to mitigate its environmental impact.


Scope of Work

  • Carrying out the design of the wastewater treatment and the soil and water table de-contamination.
  • Identifying and qualifying the lagoon’s waters and sludge in order to increase the contamination of the water table and evacuate this waste to the appropriate treatment processes.
  • Mobilizing all of its engineering capabilities.
  • Execute and analyze the planned designs and documents presented by the pre-qualified contractor.
  • Supervising the works.


Finance

Public Works Authority (Ashghal) is the client.


Additional Notes

Located in the Al Rayyan region, Al Karaana lagoon, which covers more than four square km area is raising serious environmental problems. Almost 60,000 cu m of untreated wastewater per day is discharged onto this site by tanker. Most notably causing the contamination of the water table by infiltration, producing foul odours and creating safety risks connected with the transport of sewage.

Ashgal also pointed out that it’s working towards the eradication of the lagoon and the site’s comprehensive overhaul, in continuation of the measures taken to date to mitigate its environmental impact.


Feed/Design

Pre Qualified

Egis Group
15 avenue du Centre CS 20538 Guyancourt 78286 Saint-Quentin-en-Yvelines CEDEX France
Tel: +3 31 3941 4000
Web: www.egis-group.com

Short Listed

Egis Group

Awarded

Egis Group

PMC

Pre Qualified

Egis Group
15 avenue du Centre CS 20538 Guyancourt 78286 Saint-Quentin-en-Yvelines CEDEX France
Tel: +3 31 3941 4000
Web: www.egis-group.com

Short Listed

Egis Group

Awarded

Egis Group

EPC

Pre Qualified

Degremont
Tour CB21 - 16, place de l'Iris 92040 Paris La Défense cedex, France
Tel: +3 31 5881 5000
Web: www.degremont.com
Hyundai Engineering & Construction
75 Hyundai Bldg, Jongno-Gu, Seoul, 110-192 Korea
Tel: +82 1577 7755
Web: www.hdec.co.kr
PORR Group
Absberggasse 47, A-1100 Wien
Tel: +43 506 260
Web: www.porr-group.com
Qatari Diar Vinci Construction (QDVC)
Tornado Tower, 33rd floor Dafna Area, Doha
Tel: +974 4453 8400
Email: [email protected]
Web: www.qdvc.com
Suez Environnement
Tour CB 21 16, place de l''Iris, 92040 Paris La Défense Cedex France
Tel: +33 1 5881 2000
Web: www.suez.com
Swissboring
Al Quoz Industrial Area First, Dubai
Tel: +971 4323 5311
Email: [email protected]
Web: www.swissboring.com

Related Contacts


Public Works Authority (Ashghal)

Name: Khalid Bader
Designation: Public Relations Manager
Telephone:+974 4495 0000


Updates

Mar 2018

Construction works are likely to commence in the second quarter of 2018 with completion expected in 2020.

Nov 2017

Suez Environnement has been awarded the DBO contract to construct Al Karaana Lagoon.

Feb 2017

DBO bids are under evaluation. An award is expected in the second half of 2017.

Dec 2016

Several local as well as international companies have submitted their bids for the main rehabilitation works contract. 

Oct 2016

Bid submission deadline has been pushed back to the end of November.

Sep 2016

The following pre-qualified companies have purchased the tender documents for the construction contract:

  • Degremont
  • Hyundai Engineering & Construction
  • PORR Group
  • Qatari Diar Vinci Construction (QDVC)
  • Swissboring
Aug 2016

Tenders have been issued inviting companies to submit bids for the rehabilitation contract. The bid submission deadline is in late September 2016.

Jun 2016

Design works have been completed.

Feb 2016

Tenders for the design-build-operate (DBO) contract are likely to be issued in July 2016. 

Apr 2015

French firm Egis has been awarded a 23-month contract to do basic engineering and design works.