Al Zour North Independent Water and Power Plant (IWPP) - Package Two

Owner/Developer Kuwait Authority for Partnership Projects (KAPP)
Kuwait Ministry of Electricity and Water (MEW)
Estimated Value US$ 900,000,000
Sector Power
Sub Sector Independent Water & Power Plant (IWPP)
Country Kuwait
City North
Capacity N/A Feasibility Start Date Q1-2013
Status FEED/Design ITB Project End Date Q2-2022
Owner/Developer Kuwait Authority for Partnership Projects (KAPP)
Kuwait Ministry of Electricity and Water (MEW)
Estimated Value US$ 900,000,000
Sector Power
Sub Sector Independent Water & Power Plant (IWPP)
City North
Country Kuwait
Capacity N/A
Feasibility Start Date Q1-2013
Status FEED/Design ITB
Project End Date Q2-2022


Project Overview


Background

Kuwait Authority for Partnership Projects (KAPP) in partnership with Ministry of Electricity & Water (MEW) is in the process of executing package two of an independent water and power project (IWPP). The scheme will be located at the Al-Zour North Site on the Arabian Gulf coast 100 km south of Kuwait City.

Upon completion, package two of the gas-fired IWPP will produce 2,700 megawatts (MW) of electricity and 165 million cubic meters a day of desalinated water.


Scope of Work

The scope of work involves the development, design, engineering, construction, ownership, operation, maintenance and transfer of a power and desalination plant with a net capacity of 2,700 MW of power (Combined Cycle Gas Turbine) and net water capacity of 165 million gallons per day of desalinated water.

2,700 MW of power (Combined Cycle Gas Turbine):

  • Boilers & auxiliaries.
  • Cathodic protection.
  • Demineralized water plant.
  • Diesel generators.
  • Distributed control system (DCS).
  • Piping and substation.
  • Steam turbine generator units.
  • Related facilties.

165 million gallons per day of desalinated water:

  • Auxiliary boilers.
  • Chemical storage and dosing system.
  • Chlorination and re-mineralisation plant.
  • Potable water storage tank.
  • Seawater intake pumping station.
  • Related facilties.

The scope will also use natural gas as its main fuel and gas oil as back-up fuel. Gas and gas oil will be provided by the Electricity and Water Ministry. The desalination plant will use either a 100 per cent thermal process or a hybrid process. In the case of a hybrid solution, the capacity of the reverse osmosis plant is not to exceed 25 per cent of the total desalination capacity. 


Finance

Kuwait Authority for Partnership Projects (KAPP), Kuwait’s public-private partnership (PPP) body which was formerly called the Partnerships Technical Bureau (PTB), is overseeing the development of the scheme in partnership with the Ministry of Electricity & Water (MEW).

KAPP will oversee the creation of a joint stock company, which will build, operate and transfer (BOT) the project for an investment period of 25 years. The project company will sign an Energy Conversion and Power Purchase Agreement (ECPA) with the MEW.


Additional Notes

The plant is being built on a build-own-operate-transfer (BOOT) model with a 40-year power purchase agreement.

Consortium of Chadbourne & Parke LLP, BNP Paribas and Lahmeyer International will carry out the financial, legal and technical advisory services for the plant.

Nippon Steel & Sumikin Stainless received a contract from MEW to supply 4,300t of ASTM S32304 and S31803 grade duplex stainless steel plates for the integrated power and desalination plant.



Related Companies


Owner/Developer

Kuwait Authority for Partnership Projects (KAPP)
Touristic Enterprises Company Building, Second Floor, Al-Shuwaikh Administrative Zone, Al Jahra Street, Kuwait
Tel: +965 2496 5900
Email: info.ptb@ptb.gov.kw
Web: www.ptb.gov.kw
Kuwait Ministry of Electricity and Water (MEW)
Safat 13001, South Al Sourra Street, Ministries Area, Al Asimah, State of Kuwait
Tel: +965 2537 1000
Web: www.mew.gov.kw

EPC

Pre Qualified

Abengoa
C/ Energía Solar nº 1 Palmas Altas 41014-Seville, Spain
Tel: +3 49 5493 7000
Email: abengoa@abengoa.com
Web: www.abengoa.com
Acwa Power
Riyadh 11416, Kingdom of Saudi Arabia
Tel: +966 1 1283 5555
Web: www.acwapower.com
AL MULLA GROUP
Free Trade Zone, Shuwaikh, Safat 13002
Tel: +965 2225 0888, +965 2225 0999
Email: info@almullagroup.com
Web: www.almullagroup.com
Alghanim International
Safat 13022, Kuwait
Email: construction@falghanim.com
Web: falghanim.com
Hyundai Engineering & Construction
75 Hyundai Bldg, Jongno-Gu, Seoul, 110-192 Korea
Tel: +82 1577 7755
Web: www.hdec.co.kr
Hyundai Heavy Industries (HHI)
1000 Bangeojinsunhwando-Ro, Dong-Gu Ulsan, South Korea
Tel: +8 25 2202 2114
Web: www.hhi.co.kr
Marubeni Corporation
4-2, Ohtemachi 1-chome, Chiyoda-ku, Tokyo 100-8088, Japan
Tel: +81 332 822 111
Web: www.marubeni.com
Mitsubishi Corporation
6-1, Marunouchi 2-Chome, Chiyoda-ku, Tokyo, 100-8086
Tel: +81 3 3210 2121
Web: www.mitsubishicorp.com
National Industrialization Company (Tasnee)
Riyadh 26707, Saudi Arabia
Tel: +966 11 222 2205
Email: general@tasnee.com, general@inc.com
Web: www.tasnee.com
Samsung C&T Corporation
14, Seocho-daero 74-gil, Seocho-gu, Seoul, 06620, Korea
Tel: +8 22 2145 2114
Web: www.samsungcnt.com
Sumitomo Corporation
Harumi Island Triton Square Office Tower Y, 8-11, Harumi 1-chome, Chuo-ku, Tokyo 104-8610, Japan
Tel: +81 3 5166 5000
Web: www.sumitomocorp.co.jp

Awarded

Sub-contractor

Pre Qualified

BNP Paribas
787 7th Avenue, New York, NY 10019, United States
Tel: +1 21 2841 3000
Web: www.usa.bnpparibas.com
Chadbourne & Parke LLC
1301 Avenue of the Americas, NY 10019-6022, New York City, NY, United States of America
Tel: +1 21 2408 1155
Web: www.chadbourne.com
Lahmeyer International
Friedberger Straße 173 61118 Bad Vilbel Germany
Tel: +4 9610 1550
Web: www.lahmeyer.de
Nippon Steel & Sumikin Stainless Steel Corporation (NSSC)
2-6-1, Otemachi,Chiyoda-Ku, Tokyo
Tel: +81 3 3276 4800
Web: nssc.nssmc.com

Related Contacts


Kuwait Authority for Partnership Projects (KAPP)

Name: Adel Al-Roumi
Designation: General Manager
Telephone:+965 2496 5980
Email Address: arumi@ptb.gov.kw


Updates

Aug 2018

Several pre-qualified companies were invited to submit bids for the front-end engineering and design (FEED) contract with bid submission deadline in October 2018. 

Nov 2017

The client has combined package two and three together and several pre-qualified companies were invited to submit bids for the advisory roles.

Oct 2017

The project has been revived. 

Tenders for the BOOT contract are likely to be issued in 2018. 

Mar 2017

The project is put on hold. The time-frame for revival of the project has not yet been decided.

Jun 2016

Several companies presented their bids for the BOOT contract. 

Mar 2016

The deadline to submit bids for the BOOT contract is in the second quarter of 2016, with an award expected in 2017.

Sep 2015

Several pre-qualified companies were invited to submit their bids for the BOOT contract. 

Aug 2015

Tenders for the build-own-operate-transfer (BOOT) contract has been issued.


Location